Route information for RE 4 (26438)
Route from the 16.06.24
Station / stop
Arrival
Departure
Platform
Current
Please note
Days of operation: runs daily
(Dortmund Hbf --> Wuppertal-Vohwinkel)
Days of operation: runs daily (Wuppertal-Vohwinkel --> Düsseldorf Hbf)
Days of operation: runs daily, not 4. Jul (Düsseldorf Hbf --> Mönchengladbach Hbf)
Days of operation: runs daily, not 4., 7. Jul (Mönchengladbach Hbf --> Rheydt Hbf)
Days of operation: runs daily, not 4., 7. Jul (Rheydt Hbf --> Aachen Hbf)
Operator: National Express
Number of bicycles conveyed limited
space for wheelchairs
Behindertengerechtes Fahrzeug
power sockets for laptop
air conditioning
Wifi available
Number of bicycles conveyed limited
space for wheelchairs
Behindertengerechtes Fahrzeug
power sockets for laptop
air conditioning
Wifi available